2018Government of Sierra LeoneWater SupplyWater Treatment

Rokel River Water Supply Project

Mission

Feasibility, preliminary and detailed design, work drawings and tender documents for a 100,000 m³/day drinking-water treatment plant (phase II: 200,000 m³/day) and a 60 km transmission main from the Rokel intake to Freetown East.

Client
Ministry of Water Resources
Year
2018
Location
Rokel River intake to Freetown, Sierra Leone
Donor
Government of Sierra Leone
Scale
100,000 m³/day drinking-water treatment plant · 60 km transmission main
Instruments
Feasibility Study Report · Preliminary design · Final design · Detailed design · Tender documents · Work drawings