Back to references
2019Government of Sierra LeoneRoads & TransportBridges & Structures
SLRA Strategic Roads Package III — Songo Junction – Moyamba
Mission
Feasibility Study Report, preliminary and final design, detailed design and tender documents for the Songo Junction to Moyamba corridor of the SLRA Strategic Roads Package III programme.
- Client
- SLRA — Sierra Leone Roads Authority
- Year
- 2019
- Location
- Songo Junction – Moyamba, Sierra Leone
- Donor
- Government of Sierra Leone
- Scale
- Strategic road corridor — full engineering package
- Instruments
- Feasibility Study Report · Preliminary design · Final design · Detailed design · Tender documents
Related references
2019Government of Sierra Leone
SLRA Package III — ESIA, RAP, Gender & Poverty (Songo Junction – Moyamba)
SLRA — Sierra Leone Roads Authority
Roads & TransportE&S Safeguards
View project2019Government of Sierra Leone
SLRA Package III — ESIA, RAP, Gender & Poverty (Blama – Koribondo – Sumbuya – Bo / Mattru)
SLRA — Sierra Leone Roads Authority
Roads & TransportE&S Safeguards
View project2019Government of Sierra Leone
SLRA Package III — ESIA, RAP, Gender & Poverty (Sumbuya – Tormabum)
SLRA — Sierra Leone Roads Authority
Roads & TransportE&S Safeguards
View project