Skip to content
Back to references
2019Government of Sierra LeoneRoads & TransportBridges & Structures

SLRA Strategic Roads Package III — Songo Junction – Moyamba

Mission

Feasibility Study Report, preliminary and final design, detailed design and tender documents for the Songo Junction to Moyamba corridor of the SLRA Strategic Roads Package III programme.

Client
SLRA — Sierra Leone Roads Authority
Year
2019
Location
Songo Junction – Moyamba, Sierra Leone
Donor
Government of Sierra Leone
Scale
Strategic road corridor — full engineering package
Instruments
Feasibility Study Report · Preliminary design · Final design · Detailed design · Tender documents