Back to references
2019Government of Sierra LeoneRoads & TransportBridges & Structures
SLRA Package III — Feasibility, detailed design and tender documents (Kamakwie – Fintonia)
Mission
Feasibility Study Report, preliminary and final design, detailed design and international-standard tender documents for the Kamakwie – Fintonia corridor.
- Client
- SLRA — Sierra Leone Roads Authority
- Year
- 2019
- Location
- Kamakwie – Fintonia, Sierra Leone
- Donor
- Government of Sierra Leone
- Scale
- Full engineering package: FSR → detailed design → tender
- Instruments
- Feasibility Study Report · Preliminary design · Final design · Detailed design · Tender documents
Related references
2019Government of Sierra Leone
SLRA Strategic Roads Package III — Songo Junction – Moyamba
SLRA — Sierra Leone Roads Authority
Roads & TransportBridges & Structures
View project2019Government of Sierra Leone
SLRA Package III — ESIA, RAP, Gender & Poverty (Songo Junction – Moyamba)
SLRA — Sierra Leone Roads Authority
Roads & TransportE&S Safeguards
View project2019Government of Sierra Leone
SLRA Package III — ESIA, RAP, Gender & Poverty (Blama – Koribondo – Sumbuya – Bo / Mattru)
SLRA — Sierra Leone Roads Authority
Roads & TransportE&S Safeguards
View project